{"id":5727,"date":"2026-07-29T12:47:32","date_gmt":"2026-07-29T12:47:32","guid":{"rendered":"https:\/\/bigwesttemp.com\/inhouseplumbing\/?page_id=5727"},"modified":"2026-08-03T17:50:01","modified_gmt":"2026-08-03T17:50:01","slug":"why-doing-replacement-in-stages-costs-more","status":"publish","type":"page","link":"https:\/\/bigwesttemp.com\/inhouseplumbing\/case-studies\/why-doing-replacement-in-stages-costs-more\/","title":{"rendered":"Why Doing Cast Iron Replacement in Stages Can Cost Significantly More Over Time"},"content":{"rendered":"<div id=\"pl-5727\"  class=\"panel-layout\" ><div id=\"pg-5727-0\"  class=\"panel-grid panel-has-style\" ><div class=\"siteorigin-panels-stretch panel-row-style panel-row-style-for-5727-0\" data-stretch-type=\"full\" ><div class=\"so-panels-full-wrapper\" ><div id=\"pgc-5727-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-5727-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child\" data-index=\"0\" ><div class=\"border_bott panel-widget-style panel-widget-style-for-5727-0-0-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h1 style=\"text-align: center;\">Why Doing Cast Iron Replacement in Stages Can Cost Significantly More Over Time<\/h1>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-5727-0-0-1\" class=\"so-panel widget widget_sow-editor panel-last-child\" data-index=\"1\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p style=\"text-align: center;\">This case study examines how completing under-slab cast iron sewer replacement in multiple stages increased total cost and disruption compared to completing the full replacement in a single construction event. It illustrates why underground work does not divide evenly when split into phases.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div><div id=\"pg-5727-1\"  class=\"panel-grid panel-has-style\" ><div class=\"siteorigin-panels-stretch panel-row-style panel-row-style-for-5727-1\" data-stretch-type=\"full\" ><div class=\"so-panels-full-wrapper\" ><div id=\"pgc-5727-1-0\"  class=\"panel-grid-cell\" ><div id=\"panel-5727-1-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child\" data-index=\"2\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">Location<\/h2>\n<p>Carrollton, Texas (75007)<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-1\" class=\"so-panel widget widget_sow-editor\" data-index=\"3\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">The Situation<\/h2>\n<p>In this case, the homeowner was considering completing the sewer work in multiple stages instead of completing everything at one time.<\/p>\n<p>On the surface, staged work can sound reasonable.<br \/>\nIt can feel like you are spreading cost out over time.<\/p>\n<p>But with underground cast iron sewer systems, staged work does not simply divide the cost evenly.<\/p>\n<p>It creates more cost, multiple construction events&nbsp;\u2014 and changes everything.<\/p>\n<p>To help explain this clearly, we created diagrams showing what each path would realistically look like for this specific home.<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-2\" class=\"so-panel widget widget_sow-editor\" data-index=\"4\" ><div class=\"img_border panel-widget-style panel-widget-style-for-5727-1-0-2\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">Option 1\u00a0\u2014 Full Replacement (One Construction Event)<\/h2>\n<p>Before looking at staged work, it\u2019s important to understand what full replacement looks like when everything is completed at one time.<\/p>\n<p>In a full replacement scenario, the entire failing cast iron system is addressed in one well-planned and very controlled construction event.<\/p>\n<p>Excavation, tunneling, plumbing installation, inspection, and backfill\/restoration all happen once.<\/p>\n<p>This approach eliminates future mobilization costs, repeat disruption to the property, and repeated risk exposure.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-5866\" src=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-1-Full-Replacement.jpg\" alt=\"Option 1 Diagram - Full Replacement\" width=\"450\" height=\"584\" srcset=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-1-Full-Replacement.jpg 600w, https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-1-Full-Replacement-231x300.jpg 231w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p>When work is completed this way, the system is solved in one project instead of multiple separate projects over time.<\/p>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-5727-1-0-3\" class=\"so-panel widget widget_sow-editor\" data-index=\"5\" ><div class=\"img_border panel-widget-style panel-widget-style-for-5727-1-0-3\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">Option 2\u00a0\u2014 Stage 1 Partial Replacement (First Construction Event Only)<\/h2>\n<p>Now compare that to what staged work looks like, starting with only part of the system being replaced.<\/p>\n<p>At this stage, part of the failing system is still left in place.<\/p>\n<p>Even though some new pipe is installed, deterioration continues in the remaining cast iron.<\/p>\n<p>This means future work is guaranteed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-5865\" src=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-2-Stage-1-Partial-Replacement.jpg\" alt=\"Option 2 Diagram - Partial Replacement\" width=\"450\" height=\"584\" srcset=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-2-Stage-1-Partial-Replacement.jpg 600w, https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-2-Stage-1-Partial-Replacement-231x300.jpg 231w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p>At this point, the homeowner has already paid for:<\/p>\n<ul>\n<li>Mobilization<\/li>\n<li>Excavation setup<\/li>\n<li>Access creation<\/li>\n<li>Labor setup and teardown<\/li>\n<li>Inspection coordination<\/li>\n<li>Site restoration<\/li>\n<\/ul>\n<p>And this is only for part of the system.<\/p>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-5727-1-0-4\" class=\"so-panel widget widget_sow-editor\" data-index=\"6\" ><div class=\"img_border panel-widget-style panel-widget-style-for-5727-1-0-4\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">Option 3\u00a0\u2014 Stage 2 Later (Second Construction Event)<\/h2>\n<p>When the remaining cast iron fails later\u00a0\u2014 which is guaranteed\u00a0\u2014 the second stage becomes a completely new construction event.<\/p>\n<p>This is where many homeowners are surprised.<\/p>\n<p>The second stage is not just paying for \u201cthe rest of the pipe.\u201d<\/p>\n<p>It means paying for a second round of:<\/p>\n<ul>\n<li>Job setup<\/li>\n<li>Mobilization<\/li>\n<li>Access creation<\/li>\n<li>Excavation or tunneling<\/li>\n<li>Permits and inspections<\/li>\n<li>Site disruption again<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-5864\" src=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-3-Stage-2-Later.jpg\" alt=\"Option 3 Diagram - Later\" width=\"450\" height=\"584\" srcset=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-3-Stage-2-Later.jpg 600w, https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-content\/uploads\/Option-3-Stage-2-Later-231x300.jpg 231w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p>At this point, the project has been performed twice from a construction standpoint.<\/p>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-5727-1-0-5\" class=\"so-panel widget widget_sow-editor\" data-index=\"7\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">The Part Most People Don\u2019t Think About&nbsp;\u2014 Life Disruption<\/h2>\n<p>Cost is only one part of staged work.<\/p>\n<p>The other major factor is disruption to the home and the people living in it.<\/p>\n<p>Every underground sewer project has disruption to using the water and sewer system, as well as a minimum timeline built into it because of inspection requirements.<\/p>\n<p>Inspections must be scheduled for the day after plumbing work is completed and could take all day to complete while you are not able to run water or use the sewer system.<\/p>\n<p>There is no way to complete plumbing work and pass inspection on the same day.<\/p>\n<p>Even the smallest jobs realistically take at least two days, and that is uncommon.<\/p>\n<p>Most real-world timelines look like this:<\/p>\n<p>Day 1 \u2014 Excavation \/ tunneling<br \/>\nDay 2 \u2014 Plumbing installation + possible additional digging<br \/>\nDay 3 \u2014 Inspection (sometimes backfill can begin)<br \/>\nDay 4 \u2014 Backfill and restoration (very common)<br \/>\nDay 5\u20136 \u2014 Possible delays due to weather, soil conditions, or project size<\/p>\n<p>Most jobs of any meaningful size are 3\u20134 day projects, and sometimes longer.<\/p>\n<p>When work is staged, homeowners often go through this entire disruption cycle twice.<\/p>\n<p>Which raises a simple but important question:<\/p>\n<p>Why live through a 3\u20134 day construction event two separate times if it can be solved in one?<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-6\" class=\"so-panel widget widget_sow-editor\" data-index=\"8\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">What This Meant in This Real Job<\/h2>\n<p>When comparing staged work versus completing everything at once:<\/p>\n<p>The total combined cost of staged work in this case would have been 33%&nbsp;\u2014 almost $7,000&nbsp;\u2014 higher than completing the full replacement in a single project.<\/p>\n<p>Not because anything was done wrong.<br \/>\nNot because anyone was being dishonest.<\/p>\n<p>Because doing underground work in pieces always costs more than doing it all at once.<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-7\" class=\"so-panel widget widget_sow-editor\" data-index=\"9\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">The Important Reality Most People Don\u2019t See<\/h2>\n<p>When a project starts down the staged repair or replacement path:<\/p>\n<p>There is no clean way to reverse course later.<\/p>\n<p>If you later decide to complete full replacement, you are not \u201ccontinuing the same project.\u201d<\/p>\n<p>You are starting a second project&nbsp;\u2014 while the cost of the first one still exists.<\/p>\n<p>It can get worse if you start replacing pipe where it sits but later realize a reroute was the better option.<\/p>\n<p>Then you\u2019re stuck either continuing a very expensive replacement path&nbsp;\u2014 or starting over and abandoning pipe you already paid to install.<\/p>\n<p>In many real situations, finishing the replacement where it sits ends up costing more than just rerouting everything correctly from the start. Unfortunately, we have seen this all too many times.<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-8\" class=\"so-panel widget widget_sow-editor\" data-index=\"10\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">What We Want Homeowners To Understande<\/h2>\n<p>When cast iron reaches the stage where partial replacement is being considered:<\/p>\n<ul>\n<li>Remaining pipe is usually already deteriorating<\/li>\n<li>Future failures are guaranteed<\/li>\n<li>Future construction is guaranteed<\/li>\n<li>Total lifetime project cost will increase when split into stages<\/li>\n<li>Planning and replacing everything correctly one time is always the most cost-effective long-term way to handle under-slab \/ underground cast iron replacement<\/li>\n<\/ul>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-1-0-9\" class=\"so-panel widget widget_sow-editor panel-last-child\" data-index=\"11\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh3 case_subtitle\">Important Advice If You Are Considering Staged Work<\/h2>\n<p>If you are thinking about completing underground sewer work in stages, make sure you:<\/p>\n<p>\u2714 Get an estimate for the entire project completed at one time<br \/>\n\u2714 Get separate estimates for each individual stage \u2014 i.e., the one you want to do now and what will be needed later<br \/>\n\u2714 Add the staged costs together and compare them to the full replacement cost<\/p>\n<p>Do not assume staged work equals:<\/p>\n<p>Cost of Stage 1<br \/>\nPLUS<br \/>\n\u201cThe difference\u201d to full replacement later<\/p>\n<p>Underground construction doesn\u2019t work that way.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div><div id=\"pg-5727-2\"  class=\"panel-grid panel-has-style\" ><div class=\"blue_row border_bott siteorigin-panels-stretch panel-row-style panel-row-style-for-5727-2\" data-stretch-type=\"full\" ><div class=\"so-panels-full-wrapper\" ><div id=\"pgc-5727-2-0\"  class=\"panel-grid-cell\" ><div id=\"panel-5727-2-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child\" data-index=\"12\" ><div class=\"dark_row panel-widget-style panel-widget-style-for-5727-2-0-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 class=\"modh1\" style=\"text-align: center; text-transform: uppercase;\">Our Philosophy<\/h2>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-5727-2-0-1\" class=\"so-panel widget widget_siteorigin-panels-builder panel-last-child\" data-index=\"13\" ><div id=\"pl-w6a70d4c91a3bb\"  class=\"panel-layout\" ><div id=\"pg-w6a70d4c91a3bb-0\"  class=\"panel-grid panel-has-style\" ><div class=\"dark_row panel-row-style panel-row-style-for-w6a70d4c91a3bb-0\" ><div id=\"pgc-w6a70d4c91a3bb-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-w6a70d4c91a3bb-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p class=\"big_text\" style=\"text-align: center;\">We believe homeowners should have all information available to make the most informed decision possible.<\/p>\n<p class=\"big_text\" style=\"text-align: center;\">When it comes to doing work in stages, we will always explain both short-term and long-term realities \u2014 even if that means recommending a solution that is less profitable for us over time.<\/p>\n<p class=\"big_text\" style=\"text-align: center;\">If you ever want to understand how staging versus full replacement might apply to your specific home, we are always willing to explain the real long-term pros and cons.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><div id=\"pg-5727-3\"  class=\"panel-grid panel-has-style\" ><div class=\"siteorigin-panels-stretch panel-row-style panel-row-style-for-5727-3\" data-stretch-type=\"full\" ><div class=\"so-panels-full-wrapper\" ><div id=\"pgc-5727-3-0\"  class=\"panel-grid-cell\" ><div id=\"panel-5727-3-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child\" data-index=\"14\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2 style=\"text-align: center;\">Related Resources<\/h2>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-3-0-1\" class=\"so-panel widget widget_sow-editor\" data-index=\"15\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p class=\"big_text\" style=\"text-align: center;\">If you are evaluating full under-slab cast iron pipe replacement, you may also find these helpful:<\/p>\n<\/div>\n<\/div><\/div><div id=\"panel-5727-3-0-2\" class=\"so-panel widget widget_siteorigin-panels-builder panel-last-child\" data-index=\"16\" ><div id=\"pl-w6a70d4c91abb6\"  class=\"panel-layout\" ><div id=\"pg-w6a70d4c91abb6-0\"  class=\"panel-grid panel-has-style\" ><div class=\"siteorigin-panels-stretch panel-row-style panel-row-style-for-w6a70d4c91abb6-0\" data-stretch-type=\"full\" ><div class=\"so-panels-full-wrapper\" ><div id=\"pgc-w6a70d4c91abb6-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-w6a70d4c91abb6-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div class=\"case_study_links panel-widget-style panel-widget-style-for-w6a70d4c91abb6-0-0-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p class=\"modh4\" style=\"text-align: center;\"><a href=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/cast-iron-pipe-replacement-cost\/\">View our Cast Iron Pipe Replacement Cost page<\/a><\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><div id=\"pgc-w6a70d4c91abb6-0-1\"  class=\"panel-grid-cell\" ><div id=\"panel-w6a70d4c91abb6-0-1-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"1\" ><div class=\"case_study_links panel-widget-style panel-widget-style-for-w6a70d4c91abb6-0-1-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p class=\"modh4\" style=\"text-align: center;\"><a href=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/warranty\/\">Review our Warranty Information<\/a><\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><div id=\"pgc-w6a70d4c91abb6-0-2\"  class=\"panel-grid-cell\" ><div id=\"panel-w6a70d4c91abb6-0-2-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"2\" ><div class=\"case_study_links panel-widget-style panel-widget-style-for-w6a70d4c91abb6-0-2-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p class=\"modh4\" style=\"text-align: center;\"><a href=\"https:\/\/bigwesttemp.com\/inhouseplumbing\/case-studies\/\">Explore additional Case Studies<\/a><\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Why Doing Cast Iron Replacement in Stages Can Cost Significantly More Over Time This case study examines how completing under-slab cast iron sewer replacement in multiple stages increased total cost and disruption compared to completing the full replacement in a single construction event. It illustrates why underground work does not divide evenly when split into [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"parent":2637,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"fullpage","_genesis_custom_post_class":"","_genesis_layout":"","footnotes":""},"class_list":["post-5727","page","type-page","status-publish","entry","override"],"_links":{"self":[{"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/pages\/5727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/comments?post=5727"}],"version-history":[{"count":8,"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/pages\/5727\/revisions"}],"predecessor-version":[{"id":5871,"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/pages\/5727\/revisions\/5871"}],"up":[{"embeddable":true,"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/pages\/2637"}],"wp:attachment":[{"href":"https:\/\/bigwesttemp.com\/inhouseplumbing\/wp-json\/wp\/v2\/media?parent=5727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}