• Skip to main content

In House Plumbing Company

Schedule an Evaluation
Evaluation
Call Now (972) 992-1777

  • Home
  • Cast Iron Pipe Replacement
  • Pricing
  • Process
  • Case Studies
  • Warranty
  • Resources
    • About
    • Take Our Quiz
    • Before You Decide
    • Financing
    • Foundation Repair Guide
    • Businesses We Trust
    • Professional Affiliations
    • Blog
  • Reviews
  • Service Area
    • Plano
    • Rowlett
    • Wylie

Cast Iron Sewer Pipe Replacement Process

Introduction

Replacing cast iron sewer pipes beneath a home is a major underground construction project. Most homeowners have never experienced this type of work before, so understanding the process can make the decision much easier.

At In-House Plumbing Company, every project follows a structured process designed to keep the work organized, efficient, and clearly documented.

While every home is different, once homeowners have had time to research their situation and decide it is the right time to move forward, most projects follow the same five general stages.

Our 5-Step Replacement Process

1

Measurement Visit

Measurement Visit

Every project begins with an in-person visit to the home.

During this visit we measure and document the plumbing layout inside and outside the house. This allows us to understand where the existing cast iron pipes run and determine the best approach for replacement.

We also answer questions and discuss the homeowner’s specific concerns during this visit.

Because every home has a different plumbing layout, accurate measurements are essential before preparing a proposal.

2

Custom Proposal

Custom Proposal & Diagram

After the visit, the measurements are reviewed and a custom diagram is created showing the excavation plan for the project.

A detailed proposal is then prepared and sent to the homeowner. This proposal explains the work that will be performed along with the pricing.

In most cases, homeowners receive this information the same day as the measurement visit.

This step allows homeowners to review the plan carefully and decide whether they would like to move forward.

3

Work Begins

Work Begins

Once the proposal is approved and the project is scheduled, excavation begins.

Trenching in the yard, along with access points for tunneling under the house, are created so our team can expose the areas necessary beneath the home and in the yard to install the new PVC sewer system.

Every home is different, but the goal is always to complete the work as efficiently as possible while protecting the property.

Most projects require one to two days of excavation before the PVC pipe installation is completed.

4

Testing & City Inspection

Testing & City Inspection

After the new pipes are installed, the system must be tested and inspected.

Hydrostatic testing is performed to confirm the system is functioning properly. The city then performs an inspection to verify the work meets plumbing code requirements.

Only after the system passes inspection can the project move to the final stage.

5

Backfill & Final Walkthrough

Backfill & Final Walkthrough

Once the inspection is complete, the excavation areas are backfilled and the property is cleaned up.

A final walkthrough is performed to confirm the work has been completed as outlined in the proposal.

At this point the project is complete and final payment is collected.

Project Timeline

Most projects are completed within 3 to 5 days, depending on the size of the home, weather conditions, and project complexity.

While every home is different, the work generally progresses through the following stages:

  • Excavation and access
  • PVC pipe installation
  • City inspection and testing
  • Backfill and cleanup

Homeowners are usually able to remain in the home during the project. There will be temporary periods when water use is unavailable while certain stages of the work are completed.

Why a Structured Process Matters

Cast iron sewer pipe replacement involves excavation, plumbing installation, inspection, and restoration.

A structured process helps ensure the work is performed efficiently and meets all required standards.

Permits, testing, and inspections provide an additional level of protection for homeowners by confirming the system has been installed correctly.

Frequently Asked Questions About the Replacement Process

How long does the cast iron pipe replacement process usually take?

Most projects are completed within 3 to 5 days, depending on the size of the home, weather conditions, and overall project complexity. While every home is different, the work generally progresses through several stages, including excavation and access, PVC pipe installation, city inspection and testing, and finally backfill and cleanup.

Can we stay in our home during the project?

In most cases, homeowners are able to remain in the home during the project.

There may be temporary periods when water use is unavailable while the plumbing system is being connected, tested, or inspected. These interruptions are usually short and are coordinated with the homeowner whenever possible.

Will my yard be completely torn up?

No. Some excavation in the yard is necessary, usually in at least one location. However, the amount of excavation depends on the plumbing layout of the home. After receiving your input, the excavation plan diagram will show the areas to be excavated.

To help protect the property, our team uses plastic sheeting and places excavated soil on the plastic rather than directly on the grass. This helps protect the surrounding areas while the work is being performed.

In most cases, the primary visible area afterward is where the trench was located. We work hard to protect the yard and keep disruption to a minimum while completing the project.

What happens after the new pipes are installed?

After the new PVC piping is installed, the system must be tested and inspected. A hydrostatic test is performed to confirm the system is functioning properly, and the city performs an inspection to verify the work meets plumbing code requirements. Once the system passes inspection, the project moves to the final stage of backfill, cleanup, and completion.

Still Researching?

Researching

See real examples of cast iron replacement projects and what homeowners experienced.

View Case Studies

Have Questions?

contact us

Have questions about your specific home? Call our team to discuss your situation.

Call Now

Ready to Explore?

Ready to Explore?

Schedule an in-person evaluation.

Schedule an In-Person Evaluation

Because pricing can change over time for many reasons, it's best to schedule your evaluation when you're ready to move forward.

Quick Links

  • Home
  • Cast Iron Pipe Replacement
  • Pricing
  • Process
  • Case Studies
  • Warranty
  • Resources
    • About
    • Do I Need to Replace Cast Iron Pipes?
    • Before You Decide
    • Financing
    • Foundation Repair Guide
    • Businesses We Trust
    • Professional Affiliations
    • Blog
  • Reviews
  • Service Area

Service Areas

CITY1
CITY2
CITY3
CITY4
CITY5

See Complete Service Area

Contact Us

In-House Plumbing Company

5903 Curtis Dr.
Allen, Texas 75002

(972) 992-1777


Hours of Operation

Mon – Fri: 8 AM – 5 PM
Closed 12 PM – 1 PM for Lunch
Sat: Closed
Sun: Closed


William Hoyle M - 5556

Connect With Us

Copyright © 2026- | Privacy Policy | Terms & Conditions | Design by: Big West Marketing

Click to Call

Tap to Text